01 |
Precast Concrete Construction Systems |
1.1 |
Pre-fabricated interlocking technology without mortar with mechanized precast RCC planks and joist system |
Except Zone-V |
All Terrain |
G+3 |
All types of buildings (Residential except apartments and star hotels, Educational, Assembly Buildings, Business Buildings, Shops, Stores, departmental stores, Industrial Buildings, Storage Buildings & Hazardous Buildings)
|
- * Limited spans
- * Transportation facility
|
2 |
Light gauge steel framed structure system (LGSFS) with various walling and roofing options |
Except Zone-V |
All Terrain |
G+3 |
All type of buildings (Residential except apartments and star hotels, Educational, Assembly Buildings, Business Buildings, Shops, Stores, departmental stores, Industrial Buildings, Storage Buildings & Hazardous Buildings)
|
- * Fire resistance
- * Limited spans
|
3 |
Cast-in-Situ Structural Systems |
3.1 |
Expended steel panel reinforced with all galvanized steel wire - struts serving both load bearing structure and stay in place steel formwork filled with EPS - alleviated concrete |
II, III & IV |
All Terrain |
G+3 |
All Type of Building (Residential except apartments and star hotels, Educational, Offices, Banks, Professional establishments, Laboratories, outpatient clinics, research establishments, libraries, test houses, Electronic data processing centres, computer installations, information technology parks, Call Centres, Shops, Stores, Departmental stores, Industrial Buildings, Storage Buildings & Hazardous Buildings)
|
*Limited spans |
3.2 |
Fully load bearing with 150mm monolithic concrete core sandwich in side two layers of EPS as walling |
II, III, IV and Zone-V with the restriction upto height G+3" in the second column |
All Terrain |
Higher then G+3 as per structural design (restricted to G+3 in EQ zone V) |
All Type of Building (Residential except apartments and star hotels, Educational, Offices, Banks, Professional establishments, Laboratories, outpatient clinics, research establishments, libraries, test houses, Electronic data processing centres, computer installations, information technology parks, Call Centres, Shops, Stores, Departmental stores, Industrial Buildings, Storage Buildings & Hazardous Buildings)
|
*Limited spans |
3.3 |
Fast Bloc, insulated Concrete Form (ICF) |
3.4 |
Formwork system "Plaswall" with Two fibre cement boards (FCB) |
04 |
Partly Prefabricated and Partly Cast in Situ (EPS Based) load bearing system
|
4.1 |
Advanced building system- EMMEDUE- Factory made panels consisting of self- expended EPS sandwiched between two welded high strength galvanized wire fabric mesh |
Except Zone-V |
All Terrain |
G+3 |
(Residential except apartments and star hotels, Call Centres, Shops, Stores, Storage Buildings & Hazardous Buildings)
|
*Limited spans |
4.2 | Rapid / Quick Build 3D Panels - It is a prefabricated assembly of high-strength steel wire, which is bent into a zigzag shape |
4.3 | Reinforced EPS Core Panel System with sprayed concrete as wall, slab and stair case. |
4.4 | Concrewall panel system
|
4.5 | Bau panel construction system with sprayed concrete as wall, slab and stair case. |
05 |
Wall Paneling System
|
5.1 |
Fly ash / Cement sandwich wall/roof/floor light weight solid core EPS panel. |
Except Zone-V |
All Terrain |
G+1 |
All Type of Buildings |
*Non load bearing panels |
5.2 | Robomatic / Wall tech Hollow concrete wall panel |
5.3 |
Sandwich panels as wall & slab load bearing |
Except Zone-V |
All Terrain |
G+3 |
All Type of Buildings
|
*Non load bearing panels |
5.4 | SRPL Building system (Waffle-Crete) |
Note: Refer to the relevant IS codes for structural design guidelines. |